| |
Projects
Transportation Projects
| Project: |
Project Management Consultant Contract (PMC),
Orange County Transportation Authority (OCTA) |
| Location: |
Orange County, CA |
 |
| Client: |
Orange County Transportation Authority
(OCTA) |
| Services: |
Facilities Project Management |
| Contract Amount: |
$880,000 |
| Project Description: |
* LNG Venting System – Anaheim
and GardenGrove Bus Bases
* LNG Building Modifications – Anaheim and Garden Grove Bus Bases
* Structural Evaluation of Multiple Buildings – Anaheim, Garden Grove and
Irvine Bus Bases
* Dewatering, Gauging and Sampling of Groundwater Monitoring Wells at Irvine
Bus Base
* Underground Storage Tanks (UST) Modifications (Piping System) at Irvine, Garden
Grove, and Anaheim Bus Bases
* Maintenance Building Modification, Irvine Bus Base
*Hazardous Material Survey, Irvine Bus Base
*Seismic Retrofit of Annex Building, Garden Grove Bus Base |
| Completion: |
2007 |
|
| Project: |
Route 79 Lamb Canyon Measure A
Highway Widening |
| Location: |
Riverside County, California |
| Client: |
Riverside County Transportation
Commission (RCTC) |
| Services: |
Construction Management |
| Construction Cost: |
$30 million |
| Project Description: |
Widening of Route 79 from a two-lane
to a four-lane divided highway in Lamb Canyon, near Beaumont, Riverside,
California. |
| Completion: |
1995 |
|
| Project: |
Metro Rail Wilshire-Western Subway
Station |
| Location: |
Los Angeles, California |
| Client: |
Metropolitan Transportation
Authority (MTA) |
| Services: |
Construction Damage Cost Claim Analysis |
| Scope: |
During the construction of the Metro
Red Line station at Wilshire/Western, property owners claimed damage
due to the construction activity and interruption of business. |
| Completion: |
1993 |
|
| Project: |
Port of Los Angeles |
| Location: |
Los Angeles, California |
| Client: |
City Of Los Angeles, Department
of Ports and Harbor |
| Services: |
Construction Management |
| Construction Cost: |
$25 Million |
| Scope: |
This Port of Los Angeles
Capital Improvement Program consisted of the construction of a new
265-acre container terminal, which has a 5000-lf wharf deck, 12-buildings,
2 gates, 24 container handling cranes and backland improvements.
The program also included 8 transportation projects consisted of
30 miles of heavy track work, grade separations and bridges. |
| Completion: |
1997 |
|
Transit Facilities
| Project: |
New CNG Fueling Station
Facilty |
 |
| Location: |
Santa Ana Bus Base, California |
| Client: |
Orange County Transportation
Authority (OCTA) |
| Services: |
Project /Construction Management |
| Construction Cost: |
$5,000,000 |
| Project Description: |
Design and construction of a new
CNG Fueling Station using design build /turnkey approach. |
| Completion: |
2007 |
|
| Project: |
Maintenance Building
LNG Venting System |
| Location: |
Anaheim and Garden Grove
Bus Bases, California |
| Client: |
Orange County
Transportation Authority (OCTA) |
| Services: |
Project /Construction
Management |
| Construction Cost: |
$125,000 |
| Project Description: |
Installation of a new Liquefied
Natural Gas (LNG) Venting system, which will be used to lower the
pressure in the on- board bus LNG fuel storage tank and vent the
LNG fuel vapors safely to the atmosphere above the maintenance building
roof. |
| Completion: |
2004 |
|
| Project: |
Maintenance Building LNG Modifications |
| Location: |
Anaheim and Garden Grove Bus Bases,
California |
| Client: |
Orange County Transportation
Authority (OCTA) |
| Services: |
Project /Construction Management |
| Construction Cost: |
$350,000 |
| Project Description: |
Facility Modifications required
for operation and maintenance of LNG fueled vehicles. The work consists
of the installation of the gas detectors, removal of existing floor
drains and replacing with sump basins, modifications to the fuel
island/vacuum building ventilation and electrical systems and installation
of new rated doors and windows. |
| Completion: |
2005 |
|
| Project: |
Maintenance Building
Modifications |
| Location: |
Irvine Bus Base, California |
| Client: |
Orange County
Transportation Authority (OCTA) |
| Services: |
Project /Construction
Management |
| Construction Cost: |
$460,000 |
| Project Description: |
Modifying the existing engine re-build
area to accommodate additional and fixed route bus service bays at
the Maintenance Building. New Construction shall consist of creating
four new service bays, larger parts storage area and a larger body
shop with related components, systems, and improvements, including
but not limited to, Architectural, Structural, Mechanical, Electrical,
and Plumbing systems to accommodate the new areas and any systems
modified by the demolition work. |
| Completion: |
2005 |
|
Office/Commercial Building Projects
| Project: |
Headquarters Building,
Metropolitan Water District (Design Build) |
 |
| Location: |
Los Angeles, California |
| Client: |
Metropolitan Water District
of Southern California |
| Services: |
Owner's Representative /Construction
Management |
| Construction Cost: |
$98 million |
| Project Description: |
The 1,032,000 square foot headquarters
complex includes a 12-story office tower with a five-story wing, two-level
underground parking, a courtyard and plaza. The public spaces located
on the first floor include dining cafeteria, Board and meeting rooms,
sky-lit rotunda and exhibition areas. |
| Completion: |
1998 |
|
| Project: |
Encino Executive Plaza |
| Location: |
Encino, California |
| Client: |
Gross Enterprises |
| Services: |
Construction Support |
| Construction Cost: |
$30 million |
| Project Description: |
Construction of core and shell of
this office building consisting of a sub-grade concrete parking structure
and a steel frame superstructure. |
| Completion: |
1985 |
|
Higher Education Building Projects
| Project: |
Coast Community College
District – Measure
C Bond Projects |
| Location: |
Costa Mesa, CA |
 |
| Client: |
Coast Community College District |
| Services: |
Construction Management |
| Construction Cost: |
$370 Million |
| Project Description: |
Program and Construction Management
of Measure “C” Bond to alleviate overcrowding and improve
aging facilities. The money from Measure “C”, a $370
Million bond issue approved by the voters in November 2002, will
be used to replace of upgrade deteriorating buildings and to improve
campus safety, computer systems, and other technology. |
| Completion: |
2006 |
|
| Project: |
University of California,
San Diego |
| Location: |
San Diego, California |
| Client: |
University of California,
San Diego |
| Services: |
Construction Support |
| Construction Cost: |
$5 million |
| Project Description: |
Seismic upgrades and phasing of Galbraith Hall |
|
| Project: |
University of California, Irvine |
| Location: |
Irvine, California |
| Client: |
University of California, Irvine |
| Services: |
Construction Estimating Support |
| Construction Cost: |
$20 million |
| Project Description: |
Construction of Social Sciences building |
| Completion: |
1992 |
|
| Project: |
Adult Education Center |
| Location: |
Simi Valley, California |
| Client: |
Simi Valley Unified School District,
California |
| Services: |
Budgeting and Cost Estimating |
| Construction Cost: |
$4 million |
| Project Description: |
Construction of an Adult Education
Center. |
| Completion: |
1993 |
|
K-12 Educational Building Projects
| Project: |
Schools Modernization |
 |
| Location: |
Indio, California |
| Client: |
Desert Sands Unified School District |
| Services: |
Construction Management |
| Construction Cost: |
$8 million |
| Project Description: |
Modernization of two elementary schools and
a high school. |
| Completion: |
1994 |
|
| Project: |
Pasadena Unified Schools New
Construction and Modernization |
| Location: |
Pasadena, California |
| Client: |
Pasadena Unified School
District |
| Services: |
Budgeting and Estimating |
| Construction Cost: |
$200 million |
| Project Description: |
Program and Project management of
Measure ''Y" bond for school facilities improvement program |
| Completion: |
2004 |
|
| Project: |
Rockfield Elementary School |
| Location: |
Oakpark, California |
| Client: |
Oak Park Unified School
District |
| Services: |
Construction Management |
| Construction Cost: |
$5 million |
| Project Description: |
Construction of a new elementary
school. |
| Completion: |
1995 |
|
| Project: |
Salem-Keizer Public Schools, Oregon |
| Location: |
Oregon |
| Client: |
Salem-Keizer Public Schools
|
| Services: |
Program Management |
| Construction Cost: |
$95 million |
| Project Description: |
Budgeting and programming
for a $95 million bond program for new construction and remodeling
of various elementary, middle, and high schools. |
| Completion: |
1992 |
|
| Project: |
Travis Ranch School and Activity
Center. |
| Location: |
Yorba Linda, California |
| Client: |
Placentia Unified School
District, California |
| Services: |
Construction Administration |
| Construction Cost: |
$12 million |
| Project Description: |
Construction of Travis Ranch School
and Activity Center. |
| Completion: |
1989 |
|
Correctional Facilities
| Project: |
West Valley Detention Center |
 |
| Location: |
Rancho Cucamonga, California |
| Client: |
County of San Bernardino |
| Services: |
Program and Construction Management |
| Construction Cost: |
$117 million |
| Project Description: |
State-of-the-art, indirect
supervision, pre-trial facility with 800,000 square feet of one-and
two-level structures. Contains 13 housing units, service & support
functions, administration, intake release, visiting and inmate services,
regional transport, and video arraignment functions. |
| Completion: |
1991 |
|
| Project: |
Sheriff's Facility |
| Location: |
San Francisco, California |
| Client: |
City of San Francisco |
| Services: |
Construction Management Support |
| Construction Cost: |
$36 million |
| Project Description: |
Construction of new sheriff's facility |
| Completion: |
1994 |
|
| Project: |
California State Prison |
| Location: |
Lancaster, California |
| Client: |
California Department of
Corrections |
| Services: |
Construction Management Support |
| Construction Cost: |
$208 million |
| Project Description: |
Consisted of 20 housing
units, 12 guard towers, central kitchen, food service, vocational
education program facilities, central administration, and related
support facilities. |
| Completion: |
1993 |
|
| Project: |
San Diego Juvenile Hall Expansion |
| Location: |
San Diego County, California |
| Client: |
General Services Administration |
| Services: |
Construction Management Support |
| Construction Cost: |
$60 million |
| Project Description: |
Project consisted of
housing units, guard towers, central kitchen, food service, vocational
education program facilities, central administration, and related
support facilities. |
| Completion: |
1993 |
|
| Project: |
Downey Municipal Court |
| Location: |
Downey, California |
| Client: |
General Services Administration |
| Services: |
Construction Management Support |
| Construction Cost: |
$40 million |
| Project Description: |
Project consisted of
housing units, guard towers, central kitchen, food service, vocational
education program facilities, central administration, and related
support facilities. |
| Completion: |
1993 |
|
Healthcare Facilities
| Project: |
Greater Los Angeles and Ventura County Veterans
Homes |
 |
| Location: |
Los Angeles, Saticoy, and Lancaster, Ca |
| Client: |
California Department of General Services (DGS),
Real Estate Services Division (RESD) |
| Services: |
Construction Project Management |
| Construction Cost: |
$148 Million |
| Project Description: |
This project involves the construction of three
new Veterans Homes in the greater Los Angeles and Ventura County
regions. Two of the homes (Lancaster and Saticoy) will be approximately
46,000 square feet each. These two homes will consist of 60 Residential
Care Facility for the Elderly (RCFE) beds with a 50-person Adult
Day Health Care (ADHC) at each site. The third home (West Los Angeles)
will be approximately 378,000 square feet plus a 34,000 square foot
kitchen. It will consist of 400 beds including FCFE, Skilled Nursing
Facility, and Alzheimer / dementia. The new homes will form a multi-campus
Veterans home network serving the Greater Los Angeles and Ventura
region. The facilities will provide various medical treatment and
care, residential care, skilled nursing, adult day care, Alzheimer
and dementia care along with support facilities. |
| Completion: |
2010 |
|
| Project: |
Rancho Los Amigos Medical Center |
| Location: |
Downey, California |
| Client: |
Los Angeles Internal Services
Department |
| Services: |
Construction Management Support |
| Construction Cost: |
$300 million |
| Project Description: |
Project consisted of
Inpatient Unit A, Operations facility, Parking Structure and Patient
Support Center |
| Completion: |
2003 |
|
| Project: |
Alaska Native Medical Center |
| Location: |
Alaska |
| Client: |
United States Department of
Health and Human Services |
| Services: |
Construction Bidding Support |
| Construction Cost: |
$100 million |
| Project Description: |
Project consisted of
Inpatient Unit, Operations facility, Parking Structure and Patient
Support Center |
| Completion: |
2002 |
|
| Project: |
Veterans Home |
| Location: |
Barstow, California |
| Client: |
California State-RESD |
| Services: |
Construction Management |
| Construction Cost: |
$24 million |
| Project Description: |
Project consisted of semi-skilled care
nursing facility with central administration, kitchen and dormitory housing
units. |
| Completion: |
1995 |
|
| Project: |
Veterans Home |
| Location: |
Chula Vista, California |
| Client: |
California State-RESD |
| Services: |
Construction Management |
| Construction Cost: |
$25 million |
| Project Description: |
Project consisted of
semi-skilled care nursing facility with central administration, kitchen
and dormitory housing units. |
| Completion: |
2000 |
|
| Project: |
Riverside Regional Medical Center |
| Location: |
Moreno Valley, California |
| Client: |
GSA County of Riverside |
| Services: |
Construction Management |
| Construction Cost: |
$153 million |
| Project Description: |
Project consisted of
Inpatient Unit, Operations facility, Parking Structure and Patient
Support Center |
| Completion: |
1997 |
|
Recreation
| Project: |
Diamond Valley Lake |
 |
| Location: |
Hemet, California |
| Client: |
Metropolitan Water District |
| Services: |
Program and Construction Management |
| Construction Cost: |
$200 million |
| Project Description: |
Metropolitan Water District
is planning a recreation development, which includes Marinas, Village
Retail/Dining, Golf Complex, Fishing and Boating Activities, Sports
Complex and Nature Trails. |
| Completion: |
2007 |
|
Infrastructure Projects
| Project: |
Treated Water Cross Connection
Program |
 |
| Location: |
Numerous locations throughout
the MWD distribution system |
| Client: |
Metropolitan Water
District |
| Services: |
Engineering, planning, and project
management support |
| Construction Cost: |
$50 million |
| Project Description: |
The purpose of this
program is to eliminate potential cross connection and prevent
possible contamination of the drinking water supplies along distribution
system. Scope of work includes field survey, site investigation,
preliminary design, final design and construction work necessary
to relocate existing below ground vacuum and air release valves
to above ground-enclosed locations. |
| Completion: |
2006/07 |
|
| Project: |
Weymouth Filtration
Plant – Oxidation
Retrofit Program |
| Location: |
Los Angeles County |
| Client: |
Metropolitan Water
District |
| Services: |
Construction Management and Inspection
Support |
| Construction Cost: |
$158 million – Program Estimate |
| Project Description: |
The purpose of this program is
to reduce the level of disinfection by-products in the treated
water supplied by the Weymouth Plant in order to meet state and
federal standards. Scope involves design and construction of oxidation
retrofit facilities at the plant. |
| Completion: |
2011/12 |
|
| Project: |
Hayfield Groundwater Storage Project |
| Location: |
Hayfield Valley, Riverside County |
| Client: |
Metropolitan Water
District |
| Services: |
Construction Support Services |
| Construction Cost: |
Unknown |
| Project Description: |
The purpose of this project is
to help ensure maximization of Colorado River Water supplies in
Metropolitan’s service area. Scope of work includes preparation
of design criteria and preliminary design reports, preliminary
and final design of facilities, construction support services and
other miscellaneous services. |
| Completion: |
2005/06 |
|
| Project: |
Diamond Valley Lake East Recreation
Infrastructure |
| Location: |
Hemet, Riverside County |
| Client: |
Metropolitan Water
District |
| Services: |
Civil Engineering Design and Construction
Support Services |
| Construction Cost: |
$58 million |
| Project Description: |
The purpose of this project is
to meet the objective of the propose strategy to implement the
design and construction of public recreation facilities which includes
Infrastructure, a trail system, water history museum and fishing
facilities at the east end of the lake. Scope of work includes
final engineering design and construction support services for
major infrastructure including drainage, water, sewer, and road
improvements. |
| Completion: |
2006/07 |
|
| |
|
Home | Contact Us
| Useful Links | Feedback
|
|